English
简体中文
Français
Pусский
Español
Português
Deutsch

You are here: Home » News » Wuling Liudong Base's Flexible Automation Welding Center Has Been Completed And Put into Use!

Wuling Liudong Base's Flexible Automation Welding Center Has Been Completed And Put into Use!

Publish Time: 2025-09-05     Origin: Site

On August 27th, the groundbreaking and completion ceremony of the brand-new flexible automated welding center at the Liudong base of the Components Division of Wuling Industrial Company, along with the launch ceremony of the F520M product, was held in a festive atmosphere. From the challenging development phase to the production launch, from the blueprint to the reality, this intelligent welding center, which embodies the efforts of the entire team, has officially been put into use, and the F520M product has successfully rolled off the production line.

One of the most significant highlights of the transformation of the flexible automated welding center is the implementation of the lean production and resource optimization utilization concepts. A large number of existing equipment were utilized for low-cost and high-efficiency renovations. The internal integration and coordination mechanism of the group was leveraged, and multiple departments worked collaboratively to accelerate the rapid implementation of the project.

Since the project was launched, after 180 consecutive days of hard work, the Flexible Automation Welding Center began to be put into use on August 10th this year. Facing the complex production characteristics of the base, which involve diverse product types and coexistence of new and old states, the project team successfully completed the transformation of 110 robots. Not only did this result in a significant increase in the welding production cycle to 45-50 JPH, but the automation rate of weld points also rose from the original 40% to 90%. The production efficiency was enhanced and the production rhythm better met the market requirements.

The novated welding center demonstrates high flexibility and can be compatible with the vast majority of product types at the base. It has solved the long-standing problem of "complex status of new and old products and difficulty in line flexibility". By optimizing the design of fixtures and management processes, the production preparation time has been significantly shortened, providing more flexible space for scheduling and significantly enhancing the production response capability.

This vivid practice of the Components Division's transformation towards automation, intelligence and specialization has further enhanced the core competitiveness of the Components Division through a series of measures such as improving equipment efficiency, promoting technological innovation, ensuring product quality and enhancing overall benefits. This has laid a solid foundation for the group to maintain its sustained competitiveness in the increasingly fierce market competition.


  • Luolong Industrial District, Luoyang City, Henan Province, China, 471000
  • E-mail us:
    andy @gold-forging.com
  • Call us on:
    +86-185 3888 7499
    +86-185 3798 9397
    +86-185 3883 0700
  • Our company has a complete mechanical parts design and production process, is a professional mechanical parts supplier.
  • Useful Links
  • Desigh & Quality Control
    Quality control - including the application of each testing equipment

    Each time our customers visit our company for first cooperation, after reviewing our production equipments, another attention is how we would do quality control, which will give them much confidence to place us orders. Usually, we would do inspection for a new steel forging parts in sides of inspect

    Quality control process flow

    Quality ControlEach time our customers visit our company for first cooperation, after reviewing our production equipments, another attention is how we would do quality control, which will give them much confidence to place us orders. Usually, we would do inspection for a new steel forging parts in s

    Forging product design

    Currently,forging method at home and abroad,mainly remains Free forging and Roll forging...

    Forging die design

    1. The main influence of mold shape on metal deformation and flow is as follows: 1) control the final shape and size of forgings;

    Forging process

    Different forging methods have different processes, among which the process of hot die forging is the longest...

  • NewsLetter
    Get latest updates and offers.